Dalaman Akköprü Dam and Hydroelectric Power Plant
Location: Dalaman River, Muğla/ Turkey
Client: DSİ - General Directorate of State Hydraulic Works of Turkey
NTF Scope: Detailed Design and Civil Construction Works
Construction Start Year: 1995
Completion %: 98 %
Completion Year: 2010
Estimated Cost: USD 350 million
Purporse:
- Flood Control
- Land Irrigation
- Power Generation
Project Highlights:
- 115 MW Installed Capacity / 343 GWh Annual Production
- 14,200 Ha Land Irrigation Area
- 6th largest Dam Body in Turkey with 13 million m3 Body Volume and 162.5 m Height
- 70 million m2 Earth Movement
- 6,400 m2 Slurry Trench
- 4,000 m Tunneling
- 700,000 m3 Concrete Works