Dalaman Akköprü Dam and Hydroelectric Power Plant


Dalaman Akköprü Dam and Hydroelectric Power Plant

Location: Dalaman River, Muğla/ Turkey
Client: DSİ - General Directorate of State Hydraulic Works of Turkey
NTF Scope: Detailed Design and Civil Construction Works
Construction Start Year: 1995
Completion %: 98 %
Completion Year: 2010
Estimated Cost: USD 350 million


Purporse:


  • Flood Control
  • Land Irrigation
  • Power Generation


Project Highlights:


  • 115 MW Installed Capacity / 343 GWh Annual Production
  • 14,200 Ha Land Irrigation Area
  • 6th largest Dam Body in Turkey with 13 million m3 Body Volume and 162.5 m Height
  • 70 million m2 Earth Movement
  • 6,400 m2 Slurry Trench
  • 4,000 m Tunneling
  • 700,000 m3 Concrete Works


Dalaman Akköprü Dam and Hydroelectric Power PlantDalaman Akköprü Dam & Hydroelectric Power Plant