Project Year 2015
Çetin Main Dam And Power Plant
Çetin Main Dam And Power Plant
Technical Details
Photogallery
Project Video

Location: Şirvan - Siirt/ Türkiye
Client: Statkraft - Çetin Enerji
NTF Scope: Civil Works
Construction Start Year: 2015
Completion Year: 2018

Estimated Cost: USD 200 Million

Purpose: Power Generation


 

  Dam Body

 

Type :  
Crest Length :  
Crest Width :  
Height from Foundation :  
Dam Body Fill Volume :  


 

Zoned rock fill with central asphalt core
500,0 m
10 m
143 m
11.000.000 m3

 

   Spillway

 

Type :  
Design Discharge :  
Energy Dissipation Type : 

 

Overflow - Controlled
5500 m3/s
Chute Ending With Flip Bucket
 Turbine and Generator 

 

Type Of Turbine :  
Type of Generator :  
Number :  
Installed capacity :  
Maximum discharge :  


Vertical shaft Francis
Vertical shaft synchronous
3 large and 1 small Units
420 MW (3 x 134 MW + 18 MW)
3 x 111 + 14 m3/sec