Projects > Completed Projects > Dalaman Akköprü Dam and Hydroelectric Power Plant
Turn Back
Project Year 2011
Dalaman Akköprü Dam and Hydroelectric Power Plant
Dalaman Akköprü Dam and Hydroelectric Power Plant
Technical Details
Photogallery
Project Video

Location: Dalaman River, Muğla/ Turkey
Client: DSİ - General Directorate of State Hydraulic Works of Turkey
NTF Scope: Detailed Design and Civil Construction Works
Construction Start Year: 1995
Completion Year: 2011
Estimated Cost: USD 494.5 Million  

Purporse: 

  • Flood Control
  • Land Irrigation
  • Power Generation

 

Project Highlights: 

  • 115 MW Installed Capacity / 343 GWh Annual Production
  • 162.5 m DAM Height
  • 14,200 Ha Land Irrigation Area
  • 6th largest Dam Body in Turkey with 13 million m3 Body Volume and 162.5 m Height
  • 70 million m2 Earth Movement
  • 6,400 m2 Slurry Trench
  • 4,000 m Tunneling
  • 700,000 m3 Concrete Works