Location: Dalaman River, Muğla/ Turkey Client: DSİ - General Directorate of State Hydraulic Works of Turkey NTF Scope: Detailed Design and Civil Construction Works Construction Start Year: 1995 Completion Year: 2011 Estimated Cost: USD 494.5 Million
Purporse:
Flood Control
Land Irrigation
Power Generation
Project Highlights:
115 MW Installed Capacity / 343 GWh Annual Production
162.5 m DAM Height
14,200 Ha Land Irrigation Area
6th largest Dam Body in Turkey with 13 million m3 Body Volume and 162.5 m Height