NTF İNŞAAT
Projects > Completed Projects > Bursa - Yenişehir Çiçeközü Pond
Turn Back
Project Year 2013
Bursa - Yenişehir Çiçeközü Pond
Bursa - Yenişehir Çiçeközü Pond
Technical Details
Photogallery
Project Video

Location: Yenişehir - Bursa / Türkiye
Client: DSİ – General Directorate of State Hydraulic Works of Turkey
NTF Scope: Construction Works 
Construction Start Year: 2010
Completion Year: 2013
Estimated Cost: USD 8 Million 

 

Purporse:

  • Irrigation

 

Technical Details:


     
   Dam Body Type :  
Crest Length :  
Crest Width :  
Height from Foundation :  
Dam Body Fill Volume :  
Clay Vore Rock Fill
531,38 m
10 m
53 m
1.040.000 m3
   Approach Channel Type :  
Length :  
Trapezoidal cross section conduit
203 m 
   Bottom Outlet Type :  
Length / Diameter :  
Design Discharge :  
Penstock with emergency valve
220 m / Ø 1000 mm
9,272 m3/s
   Spillway Type :  
Design Discharge :  
Discharge Channel Length :  
Energy Dissipation Type :  
Lateral intake without gate
156,13 m3/s
202,50 m.
Flip Buckets
Copyright © NTF CONSTRUCTION