NTF İNŞAAT
Projects > Completed Projects > Sadak DAM
Turn Back
Project Year 2014
Sadak DAM
Sadak DAM
Technical Details
Photogallery
Project Video

Location: Kelkit - Gümüşhane / Türkiye
Client: DSİ- General Directorate of State Hydraulic Works Of Turkey

NTF Scope: Construction Works
Construction Start Year: 2011
Completion Year: 2014
Estimated Cost: USD 20 Million 

Purporse:

  • Irrigation 

 

   Dam Body Type :  
Crest Length :  
Crest Width :  
Height from Foundation :  
Dam Body Fill Volume :  
Clay Core Sand-Gravel Fill
598,3 m
10 m
45 m
1.669.451 m3
   Diversion Chennel
   Concrete Conduit
Type :  
Length / Diameter :  
Modified horseshoe section
154 m / 2,5 m
   Bottom Outlet Type :  
Length / Diameter :  
Design Discharge :  
Penstock with emergency valve
92 m / Ø 800 mm
5,9 m3/s
   Spillway Type :  
Design Discharge :  
Discharge Channel Length :  
Energy Dissipation Type : 
 
Frontal intake without gate
297,10 m3/s
169 m.
II Type Basin
Copyright © NTF CONSTRUCTION