Elbistan – Çöllolar, 2003
- Electricity Generation Co. Inc. (EÜAŞ) tender for coal production to supply Elbistan B Power Plant.
- Development of the open pit mine and production of 17.25 million tonnes per year for 25 years.
- JV Partners: RWE (Germany), NTF, SHAW (USA)
- Financier: AIG (USA)
- NTF prepared technical planning and cost estimate within 6 months which was approved by RWE as the basis of the bid.
- The tender was cancelled.
Romania – Rovinari, 2003-2004
- Negotiated privatization of Rovinari Energy Complex developed by Çalık Enerji.
- 1200 MW Rovinari Power Plant
- Tismana I-II, Rovinari, Garla and Piniosa Coal Mines
- NTF performed due diligence and feasibility for the coal mines with the prospect of becoming the coal operator in case of conclusion of the project.
- Power plant due diligence and feasibility was performed by EDF.
- Negotiations between Çalık Enerji and government of Romania could not be completed.
Çankırı - Orta, Yaylakent, 2005
- Turkish Coal Enterprises (TKİ) tender for the sale of mine which has enough reserve for 170MW Plant.
- Project Company Çalık (90%) – NTF (10%) won the tender and paid $20 million.
- NTF performed all the engineering and feasibility studies which were used as the basis for the bid and the final feasibility by Vattenfall (Germany) and Pöyry (Finland)
- EPC contract for the power plant is at the tender stage.
- NTF is the prospective mine operator upon completion of the plant.
Bursa – Keles, 2006
- Turkish Coal Enterprises (TKİ) tender for the royalty rights of mine which has enough reserve for 135 MW Plant.
- Project Company Çalık–NTF won the tender.
- NTF performed all the engineering and feasibility studies.
- The project has been suspended until resolution of some environmental issues.
Bolu - Göynük, Tekirdağ – Saray Royalty Tenders, 2006
- Project company Çalık–NTF participated in Turkish Coal Enterprises (TKİ) royalty rights tenders for
- Bolu - Göynük, Greenfield power plants.
- Tekirdağ - Saray, Greenfield power plants.
- NTF performed all the engineering and feasibility studies for the bid preparation.
Tekirdağ – Malkara, Erzurum - Horasan, 2007
- Tekirdağ - Malkara
- For Unit Investment BV (Belgium) with the prospect of becoming the coal operator in case of acquisition of the mine.
- Erzurum - Horasan - Aliçeyrek
- NTF performed exploratory drilling services.
Adana – Tufanbeyli, 2006
- A Greenfield mine owned by EnerjiSA with enough reserve for 450 MW Power Plant.
- NTF performed investigation drillings, preliminary hydrogeological studies, detailed planning, prepared an extensive method statement and made a bid for the operation for a period of 3+30 years.
- Contract negotiations are ongoing.