Pervari Dam and HEPP |
Pervari Regulator and HEPP |
| Location |
Botan Stream,
Pervari-Siirt / Turkey |
Müküs Stream,
Pervari-Siirt / Turkey |
| Obtained Through |
US-Turkey Protocol |
Government Tender |
| License Period |
49 Years from Feb 2009 |
49 Years from Feb 2009 |
| Construction Period |
48 Months |
42 Months |
Conceptual Design with HEPP
Optimization - Completed by |
MPR Associates (USA),
Su –Yapı (TR) |
AF Colenco (CH),
Su –Yapı (TR) |
| Final Design to be Completed by |
Dec 2009 |
Mar 2010 |
| Water Usage Fee |
None |
51.7 TL / MWh |
| Based on Conceptual Design : |
|
|
| Capacity / Production per year |
400 MW / 889 GWh |
170 MW / 500 GWh |
| |