Pervari Hydro Projects


Pervari Map

  • Two adjacent hydro power plants in the Botan Basin in Southeastern Turkey, the main tributary of the Tigris River, with a total installed capacity of estimated 570 MW, and annual generation of estimated 1,389 GWh.
  • Both projects are licensed for 49 years with a weighted average water usage fee $14/MWh.
  • Government purchasing guarantee for the electricity produced in accordance with the “Renewable Energy Law”.
  • Both projects have already obtained Environmental Permits.
  • Projects are located on remote and unused lands and have virtually no negative social impact on the nearby settlements without requiring any household relocation.


Pervari Hydro Projects Pervari Hydro Projects Pervari Hydro Projects
Pervari Hydro Projects Pervari Hydro Projects Pervari Hydro Projects

Pervari Dam and HEPP Pervari Regulator and HEPP
   Location Botan Stream,
Pervari-Siirt / Turkey
Müküs Stream,
Pervari-Siirt / Turkey
   Obtained Through US-Turkey Protocol Government Tender
   License Period 49 Years from Feb 2009 49 Years from Feb 2009
   Construction Period 48 Months 42 Months
   Conceptual Design with HEPP
   Optimization - Completed by
MPR Associates (USA),
Su –Yapı (TR)
AF Colenco (CH),
Su –Yapı (TR)
   Final Design to be Completed by Dec 2009 Mar 2010
   Water Usage Fee None 51.7 TL / MWh
   Based on Conceptual Design :    
   Capacity / Production per year 400 MW / 889 GWh 170 MW / 500 GWh